During the summer months the population triples and the waste production is multiplied by four, with daily peaks of over 150 tonnes.
Baling of MSW
Temporary storage of waste at transferstation in Heßheim, Germany.
Baling of MSW
Island applications for the round baling system.
Baling of MSW
Seasonal storage of Municipal Solid Waste and back-up for incinerator plant.
Baling of MSW
Waste from Jeonju and two small towns nearby generated a total of 600 bales/day, our machines were commissioned to operate 10 hours/day, 6 days/week.
Baling of MSW
With nearly all available landfill capacity used up and more than 300 tonnes of waste generated every day, a quick solution was needed.
Baling of MSW
Installation of Flexus baler at WtE plant in Nimes, France.
Baling of MSW
Due to bad roads and heavy traffic, transporting waste to the landfill during the summer was unfeasible, hence the waste had to be stored awaiting transport when the tourist season was over.
Baling of MSW